Project Brief

This project involved the dismantling of the existing water piping system and the installation of new PVC piping to serve approximately 150 shops within the building. The work included upgrading the water supply system to improve reliability, pressure distribution, and overall functionality.

A total of four 500-gallon water tanks located on the ground floor were configured to supply water to the 2nd floor water tank using a booster pump system. From there, the 2nd floor water tank supplies water to the 1st floor water tank through a pressure pump, ensuring adequate and consistent water pressure to the taps across all connected shop units.

As part of the upgrade, all old water tanks were dismantled and removed, and new water tanks were installed to replace the outdated units. Additional supporting works were carried out, including the installation of plinths and bases for the tanks to ensure proper structural support and stability.

Miscellaneous works were also completed to restore affected areas, such as touch-up repairs, re-cementing of broken wall and floor openings, and other minor finishing works resulting from the pipe replacement process.

Project

MBPJ Pasar Sungai Way Pipe Upgrade Works

Client

MBPJ

What We Did

Pipe and Pump Installation

Some Title Text

Pityful a rethoric question ran over her

The project aimed to deliver a more efficient and reliable water distribution system while ensuring proper installation standards and improved water pressure for all shop units.

Some Title Text

When she reached the first hills of the Italic Mountains

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper matti. I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper matti.